E15 Service Shaft, Co O Gold Mine, Philippines

  • Depth: 506m
  • Number of Levels Serviced: 7
  • Shaft Size: 3.65m by 3.20m
  • Lining: 100mm Fibrecrete
  • Conveyance: 40 men & 3 tonne payload
  • Conveyance Guidance: 4 off 26mm ropes
  • Conveyance Speed: 4m/s

 

Winder House Construction

 

Sinking Configuration

 

Main Winder

 

Stage Winders

 

Cross Head Installation

 

Drilling

 

Mucking

 

Drawbridge Fabrication & Pre-commissioning

 

Lower Shaft Steelwork Fabrication

 

Lower Shaft Steelwork Arriving on Site

 

Lower Shaft Steelwork Looking Down From Level 10

 

Construction at Level 10

 

Drawbridge at Level 5

 

Level 10

 

Collar Drainage

 

Operating Configuration

 

CO O E15 SHAFT