10 – Supply of Mine Equipment & Infrastructure

QA/QC Services

  • Client/Owner Representative
  • Workshop pre-qualification & auditing
  • Technical documentation – pre & post award
  • Materials verification & traceability
  • Welding co-ordination & supervision
  • Welding quality inspection & NDT
  • Dimensional inspection
  • Quality assurance documentation to ISO, Australian & American Standards

Shaft Sinking

  • Sinking headframes, kibble winders & stage winches
  • Collar doors
  • Ropes & attachments
  • Rope up winches & rope proof load testing
  • Concrete formwork, slick line, kettle & octopus
  • Sinking work stages, man cages & work baskets
  • Kibbles, trolleys & work baskets
  • Services (ventilation fans/ducting, compressed air, power, communications, water etc)

Ore Passes

  • Ore pass grizzlies
  • Ore pass liners

Loading Stations

  • Feeders
  • Conveyors
  • Skip loading

Winders & Headframes

  • Winders & winder house
  • Headframes
  • Ropes & attachments
  • Shaft steelwork (fixed guides)
  • Drawbridges (rope guides)
  • Lower shaft steelwork (rope guides)
  • Skips & conveyances

Recent Work

  • E15 service Shaft Lower Shaft Steelwork & Drawbridges – Review and approve workshop QA/QC system, review and approve workshop capability, kick off meeting and agree schedule, review shop drawings, submit technical queries to engineer/s for approval, confirm materials prior to start, visual inspections to confirm material, weld and dimensional compliance, schedule monitoring, pre-assembly and mechanical functional testing, visual inspection of galvanising, monitor packing, loading and shipping.
  • Golden Point Shaft – Procurement of shaft sinking equipment.